Water Management Equipment for Civil Works

A key service we provide to contractors is the hiring of flood barrier equipment for dewatering construction projects. Please read on.


Riverlane Stream Upgrade

Location: Waiuku, Waikato
Contractor: Dempsey Wood
Duration: 3 months

The Riverlane stream was upgraded with clearing of shrubs and debris from the stream banks and installing gabion rock filled cages and geo textile and loose rock covering. 80 metres of the 1.25m high Geodesign Steel Barrier was used to divert the stream to allow the bank work to be carried out as well as controlling silt contamination. Read more in this Contractor Magazine article.

Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier

Riddell Rd Culvert Upgrade

Location: Waiuku, Waikato
Contractor: Dempsey Wood
Duration: 3 months

A culvert upgrade was carried out under Riddell road in Glendowie. 10 metres of the 1.8m high and 7 metres of the 1.25m high Geodesign Steel barrier was used to block the tidal flows up to the culverts to allow the works to be carried out. The barrier also allowed the storm water that flow from the upstream side to pass under the barrier at low tide levels.

Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier

Hydroelectric Generator Installation

Location: Marakopa, Waikato
Contractor: Dairy Tech
Duration: 3 months

40m of the 1.8m high Geodesign Steel Barrier was used to create a dewatered area for installing the intake of a small scale hydroelectric generator. This site proved to be a challenge due to the nature of the sub surface water flows which resulted in a wider membrane being installed to reduce seepage into the below river level intake area.

Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier Geodesign Steel Barrier


Hydro Response is based in Christchurch, New Zealand. To contact us please ring the phone number at the bottom of this page or use the contact form. We respond very quickly to all customer requests and look forward to hearing from you.